---
name: integrator-sort
description: Use this skill when a defense leader, program office, unit, or defense-tech company wants to decide who should integrate one class of system (industry, industry with warfighters judging, a Warwright team with reach-back, or a Warwright team at the unit). It runs the Integrator Sort's seven questions with the evidence behind each answer, applies the placement rules, recommends a lane from I to IV with its reasoning, drafts a Gate Map with every gate marked "to be confirmed by the owning authority," and, for lanes III and IV, recommends the Multi-Player Mode the team should run in. Triggers on requests like "who should integrate this," "run the Integrator Sort," "what lane is this system in," "should a unit build this or should industry," "our kit is being copied, does that change anything," or "what gates does this build face."
---

# Integrator Sort
This skill is Labor as Code™ for the sorting method in *You Are Not the
Warfighter*. Labor as Code is a skill that
encapsulates a person's knowledge, judgment, taste, and skill in
durable, inspectable, versioned form. The know-how is treating
"who integrates this?" as a question with an answer, decided from facts
someone can write down, instead of a choice the first contract made by
default.

The method spans four chapters. "Sort Every System by Who Should
Integrate It" teaches the Integrator Sort, its four lanes, and its
placement rules, worked on the Cairn Division's counter-drone kit as it
grew from one kit to seven. "Warfighters Should Not Integrate What
Industry Does Best" says where the Sort points to industry. "Pass Every Legal, Safety, and Cyber Gate Without Rebuilding the Old Chain" teaches the Gate Map, worked
on the Larkspur Brigade's armed drone variant. "Start With One Builder, and Add Builders Only When One Can’t Do the Job" teaches Multi-Player Mode. Read them for
the argument and the worked cases. This skill applies the method to the
user's own system. It never borrows the cases' facts, costs, or dates
as the user's.

**The lane is a recommendation; government people decide it.** The
skill states which lane the evidence points to and why, because a Sort
with no conclusion is an unfinished run.
The lane itself is set by the government people who hold integrating
authority, a commander or a portfolio acquisition executive (PAE), in
writing. FAR 7.503 bars contractors from "determining what supplies or
services are to be acquired by the Government." A contractor, a vendor,
or this skill can supply facts for every answer. None of them owns the
answer.

**The skill never decides a gate.** Whether a legal review, safety
certification, airworthiness, weapons review, or cyber authorization
applies is a legal and safety determination. The book gives the Gate
Map no AI box for that reason: a list that misses a gate sends a team
past a review it owed, and a list that invents one teaches the team to
distrust the whole map. So the skill drafts the map from the book's
full list, drops nothing on its own judgment, and marks every row "to
be confirmed by the owning authority."

## Before running

1. **Apply the book's security rule first.** Use only unclassified,
   publicly releasable material, in an AI tool the user's organization
   has approved for it. No capability, vulnerability, or operational
   detail: no frequencies, ranges tied to named systems, countermeasure
   specifics, tactics, unit locations, or schedules. The Sort runs on
   what the system is, what it's built from, how many there are, and
   what it connects to. If the user pastes anything marked CUI, FOUO,
   or classified, or anything that reads like operational detail, stop,
   say so, and ask for a releasable description. Nothing controlled
   goes into the AI Workforce™ running this skill: its files,
   connections, or memory.
2. **Get one class, not one serial number.** A class is a kind of thing
   fielded in some quantity. Sort a family of systems one class at a
   time.
3. **Get a plain description.** What it does; its parts, with makers
   and origin where known; how many exist and are planned; what network
   it connects to, if any; whether it carries or could carry a weapon;
   its weight class if it flies; how long it should serve; any test
   reports. Record each fact's source.
4. **Ask who will sign, and who wrote the description.** Name the
   government person who will own the Sort sheet. If a contractor wrote
   any of the description, record it; their facts stay, and the
   government signer restates the conclusions.
5. **Ask what prompted the Sort:** copies, a network connection,
   arming, a weight-class change, a funding request. The trigger usually
   tells you which answer just moved.

## Step 1: Answer the seven questions with evidence

Answer each from the user's material only, and quote or cite the fact
behind it. Where the material is silent, write "unknown" and name who
could answer. An answer without evidence is a preference with a number
on it.

1. **Consequence.** If it fails, who is hurt, and did they choose the
   risk: the crew or unit using it, other friendly forces, or
   civilians? Is the harm containable by test?
2. **Gates.** Which certifications must it pass, and can a unit-level
   team carry them, even with its partners? (Weapons legal review,
   airworthiness above Group 2, nuclear surety, energetics and
   explosives safety, an ATO on DoD networks, spectrum, component-origin
   rules.) Mark each "to confirm"; Step 3 lays out the full map.
3. **Scale.** How many are needed, and does producing them need rate
   production and a qualified supply chain?
4. **Life.** How long will it serve, and who sustains it after the
   builders rotate?
5. **Tempo.** How fast does the threat change what it must do: weeks,
   months, or years? A tempo with no source is "unknown."
6. **Openness.** Can it be built from components with documented
   interfaces the government has rights to use? Note origin here too.
7. **Maturity.** Are its component technologies mature, or is
   invention still required?

List every "unknown" in one place. It's the to-do list for the people
who will sign the sheet, and often the most useful output of the run.

## Step 2: Apply the placement rules and recommend a lane

The Sort doesn't average. Apply the rules in order.

1. **Check the three trumps.** Any one puts the class in lane I or II,
   whatever the other answers say: a consequence answer of "people who
   didn't choose the risk, and the harm isn't containable by test"; a
   gate a unit-level team can't carry, even with its partners; or a need
   for rate production. Name the trump and its evidence, and stop
   arguing speed or openness. Choose lane I for exquisite platforms,
   nuclear systems, manned aircraft and ships, munitions, and
   interceptors. Choose lane II for major subsystems on those platforms
   (radars, engines, weapons), where Warfighter Evidence Briefs feed the
   requirements, test at D0 to D1 decides acceptance, and the government
   still buys the data it needs.
2. **If no trump fires, weigh the pulls.** Fast tempo and open,
   documented components push toward lanes III and IV. Long life and
   larger scale push toward lane III, because a system serving for years
   across many units needs an organization that outlasts its builders.
   Lane IV fits classes that are short-lived, local, and cheap enough to
   throw away: attritable and consumable systems, printed parts and
   tools, sensor kits, plug-ins, training aids. Lane III fits mission
   software on existing platforms, planning and command-and-control
   applications, mission kits, tactical data integration, and systems
   fielded across many units, with reach-back to a software factory,
   depot, government lab, or PAE.
3. **Name what would move it.** More copies, a network connection,
   arming, a weight-class change. A lane IV prototype often becomes
   lane III the moment another unit copies it, because copying is scale.

Money isn't a Sort question, but it can force a rerun. If the user
supplies an assembled cost, note whether it crosses the dated
thresholds the book cites ($15,000 micro-purchase since October 1,
2025; the $350,000 FY2026 expense/investment line for an assembled
system), marked "for the resource manager to confirm."

## Step 3: Draft the Gate Map

At the top, write the system and configuration, the consequence answer
from Step 1, and the latest change. Then one row per gate, every gate
the book lists:

| Gate | Applies? | Owner | Clock | Evidence it needs | Latest change re-enters it? |
| --- | --- | --- | --- | --- | --- |
| Weapons legal review, and a new review for a significant change | | | | | |
| Weapons board arming request | | | | | |
| Autonomy review under DoDD 3000.09 | | | | | |
| Airworthiness | | | | | |
| Battery certification | | | | | |
| Cyber authorization | | | | | |
| Spectrum and frequency approval | | | | | |
| Explosives safety | | | | | |
| Component origin | | | | | |
| The purpose statute | | | | | |
| The inherently governmental line (FAR 7.503) | | | | | |

1. **"Applies?" reads "to be confirmed by the owning authority" in
   every row.** The skill may add why the description suggests a gate
   could apply, or that nothing in it touches the gate yet. It never
   writes "does not apply," and it never deletes a row.
2. **Owner.** Use the role the book names unless the user supplies a
   name: an authorized reviewing attorney, advised by the judge
   advocate; the weapons board; senior Department review; the service's
   airworthiness authority; the certifying authority in the unit's
   safety plan; the authorizing official (for a closed-loop drone, the
   O-6 under the July 10, 2025 memo); the spectrum manager; the
   explosives safety office; the judge advocate and contracting office;
   the resource manager; the contracting officer.
3. **Clock.** Only clocks the book states, dated, and "no clock"
   otherwise: the weapons board's 30 days and battery certification's
   one week under the July 10, 2025 memo; Group 1 and 2 drones exempt
   from airworthiness "with few exceptions," Group 3 back inside (each
   service's own implementation unconfirmed); the FY2026 NDAA's
   escalation path for ATO requests pending 180 days. Mark the autonomy
   row "being rewritten under NSPM-11; check the current version."
4. **Evidence it needs.** What the material holds, and "not in the
   material" for the rest.
5. **Re-entry.** The change that would send the build back through the
   gate: a network connection, a new battery lot or supplier, a custom
   part that changes origin status, a weight-class change, a new release
   mechanism, an autonomous feature. Size each gate to the consequence
   answer, and check consequences past the threat that started the
   project.
6. **Flag every gate with no clock.** It has to start first.

End the map by saying it goes to the judge advocate, the safety and test
lead, the authorizing official, the resource manager, and the
contracting officer together.

## Step 4: Recommend a Multi-Player Mode for lanes III and IV

Multi-Player Mode names the scale a Warwright effort runs at, by how
many people and AI Workforces are in play. An AI Workforce is a SpecKit, a harness, agents, skills, and MCPs,
assembled toward one outcome and a defined set of deliverables.

- **Single-player mode:** one Warwright, one AI Workforce. Right for a
  bounded piece (a plug-in, a staff section's app, a configuration and
  its build record, a test card set, a parts log), never a whole class.
  It ships only inside a team or with a named reviewer, and its build
  record passes the Sustainment Tail Test's question 2 first.
- **Team mode:** a Warwright team of roughly four to twelve, most of
  them warfighters who fight with the system, sharing one
  specification, one harness, shared skills, and one build record. The
  default for a lane III or IV class owned end to end. Its failure: the
  shared AI Workforce quietly becomes one member's.
- **Multi-team mode:** several teams, each with its own AI Workforce,
  federated through shared specifications, documented interfaces, a
  shared registry, and a coordinating layer that reconciles and never
  decides. Right when the class belongs to a family fielded across a
  division or a fleet on one interface set. Its risk: the coordinating
  layer turns back into the old chain. Share interfaces and evidence,
  not one approval queue.

State the mode, the reason, and what it can't own. Every mode keeps its
evidence at D0 or D1 on Distance to the Fight and passes the same gates.
For lanes I and II, no Warwright mode integrates; warfighters judge at
D0 to D1.

## Step 5: Conclude with a lane recommendation

Close with a short statement, not an evidence pack:

1. **The recommended lane,** in one line.
2. **The reasoning,** in three to five sentences tied to specific
   answers: which trump fired or didn't, and which pulls decided it.
3. **What would move it,** and when to re-run: whenever quantity,
   network connection, armament, or weight class changes, and before
   anyone asks for money to build copies.
4. **The next action.** For lane I or II, tell the unit in writing so
   nobody spends a year building in the wrong lane. For lane III or IV,
   name the team that would integrate it and the commander or PAE who
   would grant integrating authority in writing; the Warwright Team
   Charter in "A Warwright Team Needs Authority, Money, and Time Before
   It Needs Code" says what that grant contains.
5. **Who signs:** the government person from "Before running this."

Where answers conflict and no trump settles them (tempo pulling toward
lane IV against life and scale pulling toward lane III, or a "to
confirm" gate that would decide between lanes II and III), present the
live options side by side: each lane, its
reasoning, the answer that would make it right, and who can supply that
answer. Where too many answers are "unknown" for any lane, say so, list
the unknowns, and name who fills each. A lane built on answers with no
evidence beside them should be re-run before anyone buys anything.

## Checks before calling the work done

- **Every answer cites the user's material or reads "unknown."** Delete
  any fact supplied from general knowledge of a system type.
- **The trumps were checked first,** and none was argued away by tempo
  or openness.
- **All eleven Gate Map rows are present,** each marked "to be confirmed
  by the owning authority."
- **No capability, operational, or controlled detail appears.**
- **The conclusion names a lane or labeled options,** with reasoning,
  what would move it, and who signs.

## What this skill does not do

It doesn't grant integrating authority, contracting authority, or
money. It doesn't decide whether a gate applies, whether a change is
significant, or whether a weapon is lawful; the reviewing attorney, the
authorizing official, and the safety and airworthiness authorities do.
It doesn't let a contractor's paragraph, or its own, stand in for a
government decision about what to acquire. And it doesn't argue a class
out of industry's lanes because a unit could build it faster.

## Used in *Acquired Alpha*

A buyer deciding who should integrate a class of systems is making a purchase of a capability. In *Acquired Alpha* the sort's answer is one input to the Three-Way Sort, and each claim an integrator makes about its team goes through the book’s claim test (the Three Tests). The skill's own conclusion does not change.
